Operating Guide for MLCC Automatic Adhesive Sticking Machine

Pre - operation Preparation

1.Equipment Inspection

Appearance: Check key components of the MLCC Automatic Adhesive Sticking Machine such as the gluing head and conveying track to ensure there is no damage, looseness, and no blockage in the glue nozzle.

Electrical and Air Supply: The power cord, grounding, and air supply connections are firm, and the air pressure is within the specified range.

2.Material Preparation

MLCC Components: The specifications meet the requirements, and the surface is clean; the glue is within the shelf life and installed as required; the adhesive stickers are free of damage and have appropriate sizes.

3.Parameter Setting

Gluing Position: Set the X, Y, and Z - axis coordinates of the MLCC Automatic Adhesive Sticking Machine to ensure that the adhesive stickers or glue are accurately in place.

Gluing Speed: Adjust according to the characteristics of the glue. If the fluidity is good, the speed can be increased; if the viscosity is high, the speed should be reduced.

Others: The glue flow rate is adjusted according to the viscosity and glue layer thickness; the tension of the adhesive sticker should be suitable for the material thickness.

Operation Process

1.Feeding : Place the MLCC components on the feeding mechanism. For feeding with a vibrating plate, ensure smooth feeding; for manual feeding, arrange them neatly. Preliminary positioning and correction are completed during transportation.

2.Gluing : After the components reach the gluing station, they are accurately positioned. The glue should be applied evenly, and the adhesive stickers should be attached accurately and pressed tightly.

3.Unloading : The components after gluing are transported to the designated collection place by the unloading mechanism to avoid collision and wear.

Post - operation Maintenance

1.Cleaning : After powering off the MLCC Automatic Adhesive Sticking Machine, clean the equipment surface, gluing head, conveying track, etc. The glue supply system and adhesive sticker - related mechanisms also need to be cleaned.

2.Component Maintenance : Check the glue nozzle, the lubrication of moving parts, and the electrical system. Replace or add lubricating oil in a timely manner.

3.Recording : Record the parameter settings as well as the problems and solutions during the operation for reference in subsequent production.



Related News