Products
HTCC Leveling Machine
  • HTCC Leveling MachineHTCC Leveling Machine

HTCC Leveling Machine

Model:HTCC Leveling Machine CPZP - 2500
The YSR HTCC Leveling Machine is used for the leveling process of green ceramic sheets. Manually place the green ceramic sheets filled with slurry on the workbench, and the workbench adsorbs and fixes them. Under the action of certain pressure and temperature, they are compacted and flattened.

YSR HTCC Leveling Machine mainly consists of a gas - liquid booster cylinder, heating upper and lower plates, and an automatic transmission track. After setting a fixed heating temperature, pressure, and pressurization time on the touch screen, place the green ceramic tape to be pressurized on the heating platform, return to the pressurization position, and the booster cylinder drives the upper pressure plate to heat and pressurize the green ceramic sheet.

Pressurization function: It consists of a gas - liquid booster cylinder. Using the air source as power, it controls the output pressure of the booster to adjust the pressure of the oil cylinder. It can be equipped with a vacuum degassing function.

Heating function: Electric heating tubes and heating rods are placed under the pressure platform plate to achieve temperature heating. The temperature of the upper and lower heating plates is controlled for rise and fall and set for constant temperature through a temperature controller and a solid - state heater.

Equipment Dimensions: Approximately 1200mm (length) * 1200mm (width) * 2000mm (height)

HTCC Leveling Machine


Safety Precautions for Mechanical Equipment Operation:‌

A. Properly wear protective equipment.‌

‌B. Conduct equipment safety inspections.‌

‌C. Follow operating procedures and risk mitigation measures:‌

Do not touch moving parts (e.g., cutters, pulley wheels) with hands.

Do not adjust, measure, or clean debris by hand during operation.

For multi-person collaborative operations, clarify division of responsibilities to avoid accidental activation of control devices.

D. Equipment maintenance and emergency preparedness:‌

Perform regular maintenance and upkeep.

Clean equipment after use; inspect worn parts (e.g., cutters, bearings) and replace them promptly.

Regularly test safety devices (e.g., protective covers, emergency stop switches); unauthorized removal is prohibited.

E. Emergency response:‌

In case of sudden malfunction or accident, immediately cut off power and report the incident; do not attempt to repair equipment while it is running.


Delivery period: 90 days.





Hot Tags: HTCC Leveling Machine
Send Inquiry
Contact Info
For inquiries about our products or pricelist, please leave your email to us and we will be in touch within 24 hours.
X
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy
Reject Accept