Products
Automatic LTCC Loading and Unloading for End Firing Machine
  • Automatic LTCC Loading and Unloading for End Firing MachineAutomatic LTCC Loading and Unloading for End Firing Machine

Automatic LTCC Loading and Unloading for End Firing Machine

Model: YSA1001 (loading), YSA1002 (unloading)
The YSR Automatic LTCC Loading and Unloading for End Firing Machine is used for LTCC 0201, 0402, 0603, 0805, 1206, 1210 (different models can be achieved by changing the straight - vibration plate fixture).

YISENRONG Automatic LTCC Loading and Unloading for End Firing Machine is that the operator puts the fixture with the carrier net/cover net into the equipment, pours the chips into the hopper, and the chips are evenly spread on the carrier net through the automatic discharging mechanism and then input into the end - firing furnace in parallel. The automatic unloading equipment automatically grabs the mesh sheet output from the end - firing furnace, then collects and screens the chips, and automatically loads the empty carrier net/cover net into the fixture.


Equipment Dimensions:

Loading: 1900*1650*1750

Unloading: 2100*1800*2250

Automatic LTCC Loading and Unloading for End Firing Machine


Safety Precautions for Mechanical Equipment Operation:‌

A. Properly wear protective equipment.‌

‌B. Conduct equipment safety inspections.‌

‌C. Follow operating procedures and risk mitigation measures:‌

Do not touch moving parts (e.g., cutters, pulley wheels) with hands.

Do not adjust, measure, or clean debris by hand during operation.

For multi-person collaborative operations, clarify division of responsibilities to avoid accidental activation of control devices.

D. Equipment maintenance and emergency preparedness:‌

Perform regular maintenance and upkeep.

Clean equipment after use; inspect worn parts (e.g., cutters, bearings) and replace them promptly.

Regularly test safety devices (e.g., protective covers, emergency stop switches); unauthorized removal is prohibited.

E. Emergency response:‌

In case of sudden malfunction or accident, immediately cut off power and report the incident; do not attempt to repair equipment while it is running.


Delivery period: 90 days.




Hot Tags: Automatic LTCC Loading and Unloading for End Firing Machine
Send Inquiry
Contact Info
For inquiries about our products or pricelist, please leave your email to us and we will be in touch within 24 hours.
X
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy
Reject Accept