YISENRONG Automatic Drying and Sintering Integrated Furnace is mainly used for high-temperature sintering of thick film products, including air atmosphere sintering of thick film resistors, dielectrics, conductors, silver burning of electronic component terminals, etc. It can also be used for medium temperature heat treatment of other products.
Rated temperature: 850 ℃; Maximum temperature: 1050 ℃
Effective height: 140mm
Mesh belt width: 700mm
Furnace structure: adopting a large furnace chamber and a masonry structure made of ultra-light insulation materials
Maximum load: 50Kg/㎡
Speed range: 70-400mm/min, typical belt speed: 170-250mm/min; Variable frequency stepless speed regulation
Heating element: Infrared tube FEC heater for heating, upper heating in the drying area, and upper and lower heating in the sintering area
Sintering atmosphere: dry and clean compressed air
Air path composition: 11 intake channels, each with adjustable flow rate
Cooling method: a combination of insulation cooling, air cooling, and water cooling is used for cooling, and the water temperature of the cooling water jacket is checked at 1 point
Temperature control stability: ± 1 ℃
Safety Precautions for Mechanical Equipment Operation:
A. Properly wear protective equipment.
B. Conduct equipment safety inspections.
C. Follow operating procedures and risk mitigation measures:
Do not touch moving parts (e.g., cutters, pulley wheels) with hands.
Do not adjust, measure, or clean debris by hand during operation.
For multi-person collaborative operations, clarify division of responsibilities to avoid accidental activation of control devices.
D. Equipment maintenance and emergency preparedness:
Perform regular maintenance and upkeep.
Clean equipment after use; inspect worn parts (e.g., cutters, bearings) and replace them promptly.
Regularly test safety devices (e.g., protective covers, emergency stop switches); unauthorized removal is prohibited.
E. Emergency response:
In case of sudden malfunction or accident, immediately cut off power and report the incident; do not attempt to repair equipment while it is running.
Delivery period: 90 days.
Hot Tags: Automatic Drying And Sintering Integrated Furnace
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies.
Privacy Policy